Renovating an apartment in Thessaloniki can mean completely different things.
For one person, it may mean replacing the kitchen, floors, and paint colors.
For someone else, it may mean the complete transformation of a 1970s apartment, with a new layout, electrical and plumbing systems, windows and doors, lighting, heating, and custom-built elements.
And for an investor, it may mean something different again: assessing an older property before purchase and deciding whether it can be transformed into a home that meets the needs of today’s market.
That is why the right question is not:
“Do I need an architect to renovate?”
But:
“How much do the renovation decisions affect the functionality, construction, and long-term value of my property?”
The more the answer is “a lot,” the greater the value of a comprehensive architectural study.
When do you need an architectural firm for a renovation?
The short answer is that an architectural firm for renovation in Thessaloniki is particularly valuable when you do not simply want to change the surfaces of a space, but to rethink the way the space itself functions.
| Scenario | How important is the architectural study? | Why |
|---|---|---|
| Painting and minor aesthetic changes | Lower | The functionality does not change substantially |
| Replacing materials and furniture | Moderate | Cohesion is needed, but not always a new layout |
| New kitchen or bathroom | Moderate–High | Systems, ergonomics, and lighting are affected |
| Changing the layout | High | The way the property functions changes |
| Complete renovation of an older apartment | Very high | Design, building systems, and construction must be coordinated |
| Combining spaces | Very high | Construction must be assessed and the new organization must be properly resolved |
| Property with limited natural light | High | The layout must make better use of the available openings |
| Listed or historic building | Very high | There are additional restrictions and restoration requirements |
| Buying a property for renovation | Very high | Pre-purchase assessment can change the decision |
| Investment apartment | High | Cost, target user, and final product must be connected |
| Premium residence | Very high | Quality depends on proportions, details, and the overall design |
An architect is most useful when the renovation includes decisions that will be difficult or expensive to change later.
A wall color can be changed.
The location of the kitchen, electrical outlets, plumbing systems, lighting, room layout, and custom-built elements are not so easy to change.
Before you begin: renovation or redesign?
One of the first things that must be defined is the level of intervention.
Not every home needs a complete renovation.
Likewise, a superficial refresh is not always enough.
Three basic levels of renovation
| Level | What it usually includes | When it makes sense |
|---|---|---|
| Aesthetic refresh | Painting, light fixtures, furniture, selected surfaces | When the layout and systems already work well |
| Partial renovation | Kitchen, bathrooms, floors, lighting, selected systems | When the basic space functions but needs modernization |
| Complete renovation | New layout, systems, kitchen, bathrooms, lighting, windows and doors, materials, custom elements | When the property needs to be comprehensively redesigned |
The mistake is to determine the level of renovation only by how “old” the home looks.
An apartment may have old tiles but a very good layout.
Another may have been aesthetically renovated ten years ago and still have problematic spatial organization.
The real question is:
What works and what does not?
What should be checked before designing the new layout?
The architectural study should not begin with Pinterest references or material selections.
It should begin with an understanding of the existing property.
Architect’s renovation checklist
| Check | What we examine |
|---|---|
| Existing layout | Where square meters are being wasted and where circulation is inefficient |
| Structural system | Which elements can and cannot be changed |
| Orientation | Where real natural light is available |
| Openings | How they can be used more effectively |
| Cross-ventilation | Whether natural ventilation can be improved |
| Plumbing | Where the main risers are and which relocations are realistic |
| Electrical systems | Whether the existing network meets contemporary needs |
| Heating / cooling | What system exists and whether it needs redesign |
| Windows and doors | Energy and acoustic performance |
| Moisture | Possible signs of a problem that requires further investigation |
| Floors | Condition, levels, and potential for preservation |
| Clear ceiling heights | How they affect lighting, storage, and suspended ceilings |
| Storage | Whether there is enough and where it can be integrated |
| Acoustics | Noise from the street, neighboring uses, and the apartment building |
| Legal compliance | Whether the actual condition matches the available records |
| Permits / approvals | What is required depending on the works |
Renovating an old apartment in Thessaloniki: what changes?
A significant share of residential renovations in Thessaloniki concerns existing apartments and apartment buildings.
Age alone, however, does not tell the whole story.
Two apartments from the same decade can have completely different construction quality, layouts, lighting conditions, and technical condition.
Even so, there are some recurring issues worth checking.
Common problems in older apartments
| Problem | What it may mean for the renovation |
|---|---|
| Long corridors | Wasted square meters that may be incorporated into the main living spaces |
| Closed kitchen | Reconsidering the kitchen–living–dining relationship |
| Small bathrooms | Reorganizing secondary spaces |
| Minimal storage | Need for built-in wardrobes and custom solutions |
| Old electrical systems | Possible need for a completely new electrical design |
| Old plumbing systems | They should be assessed before new finishes are installed |
| Single-glazed windows | Acoustic and energy losses |
| Poor artificial lighting | Need for a lighting plan, not simply new fixtures |
| Underused openings | Main functions may be positioned incorrectly |
| Many small rooms | They may no longer suit contemporary lifestyles |
The important point is that a complete renovation can become an opportunity for redesign, not simply replacement.
What changes from one area of Thessaloniki to another?
As in the previous article, location affects the architectural strategy.
An old apartment in the historic center, a residence near the sea, and a larger family home in the eastern parts of the city should not be approached in the same way.
Indicative architectural priorities
| Area / Location type | What deserves particular attention |
|---|---|
| Thessaloniki city center | Natural light, noise, old layouts, building systems |
| Waterfront | Views, shading, windows and doors, wind, materials |
| Ladadika / historic areas | Building status, acoustics, preservation of character |
| Rotunda / University area | Compact living, storage, flexibility |
| Ano Poli | Historic character, slopes, access, views, restrictions |
| Toumba / Charilaou | Family functionality, storage, everyday living |
| Kalamaria | Light, outdoor spaces, family living, possible relationship with views |
| Larger residences outside the dense center | Indoor–outdoor relationship, energy strategy, broader family needs |
These are not absolute categories.
The real assessment is always made at the level of the specific property.
Thessaloniki city center: when the main problem is the layout and the light
In many urban apartments, the challenge is not a lack of square meters.
It is their poor use.
A 120 sq. m. apartment can feel smaller than a well-designed 90 sq. m. home when a significant part of it is occupied by:
- corridors,
- dark halls,
- rooms without a clear function,
- excessive partitions,
- a poor relationship between the kitchen and living area.
In such cases, the greatest architectural value does not necessarily lie in choosing more expensive materials.
It lies in the new layout.
Example
Before
- closed kitchen,
- long corridor,
- small living area,
- inadequate storage,
- one room that is rarely used.
After proper redesign
- better kitchen–living–dining connection,
- less circulation space,
- more storage,
- the possibility of a home office,
- better use of natural light,
- clearer separation between private and common zones.
An open plan is not always necessary.
What is needed is the layout that suits the specific lifestyle.
A home near the sea: it is not only about the view
In an apartment with an open outlook or a relationship to the waterfront, the view may be the main asset.
That does not mean, however, that the entire design should simply revolve around large expanses of glass.
The following must be considered at the same time:
- orientation,
- shading,
- thermal performance,
- airtightness,
- windows and doors,
- ventilation,
- privacy,
- the relationship between interior and exterior space.
Where should the main spaces be located?
When the layout allows it, it often makes sense to prioritize the best views for:
- living,
- dining,
- the master bedroom,
- workspace,
- key everyday-use spaces.
Secondary functions can be organized on less privileged sides.
But this must be decided from the beginning.
If the plumbing, walls, and electrical provisions are fixed first, the options become significantly more limited.
When is it worth changing the layout completely?
Changing the layout is not an end in itself.
Not every wall needs to be demolished just because the apartment is old.
It is worth reconsidering the arrangement when:
- large parts of the home remain underused,
- the main spaces do not receive the best natural light,
- there are too many corridors,
- the kitchen does not suit the residents’ lifestyle,
- there is not enough storage,
- there is no workspace,
- the family has different needs from those for which the home was originally designed,
- a better separation between private and shared spaces is required.
Older layout logic vs contemporary needs
| Older organization | Contemporary question |
|---|---|
| Large formal dining room that is rarely used | Is a larger everyday living area needed? |
| Separate small kitchen | Should it connect more closely with dining/living? |
| Many small rooms | Are all of them really necessary? |
| Minimal wardrobe space | Can storage be integrated into the architecture? |
| Large corridor | Can it gain a function? |
| One room per function | Are more flexible spaces needed? |
Should we always open the kitchen to the living area?
No.
Open-plan design is not automatically better architecture.
For some people it works extremely well.
For others, it does not.
Open kitchen
Advantages
- greater sense of space,
- more social interaction,
- better distribution of light,
- possibility of creating an island,
- a more unified everyday function.
Potential disadvantages
- odors,
- noise,
- less ability to hide clutter,
- less acoustic separation,
- possible loss of storage surfaces.
Closed or semi-closed kitchen
It may be a better solution when:
- intensive daily cooking takes place,
- there is a need for separation,
- the family wants clearer zoning,
- a good relationship with dining and natural light can still be maintained.
There are also intermediate solutions:
- glass partitions,
- sliding panels,
- pocket doors,
- semi-open kitchens.
The right design does not follow a trend.
It responds to a way of life.
When is it a mistake to start with materials?
One of the most common mistakes in a renovation is to begin the process with questions such as:
“Which tile should we use?”
“What color should the kitchen be?”
“Wood or marble?”
These decisions matter, but they are not the first decisions.
The correct sequence is closer to:
| Stage | Key decision |
|---|---|
| 1 | What does the resident need? |
| 2 | What can the property realistically offer? |
| 3 | What is the right layout? |
| 4 | How are the building systems organized? |
| 5 | How does the lighting work? |
| 6 | What custom elements are needed? |
| 7 | Which materials support the concept? |
| 8 | How should the details be properly constructed? |
Material selection should come as part of an overall decision.
Not as an isolated image.
Architect, interior designer, engineer, or contractor?
The roles are often confused.
They do not all do the same job.
| Role | Main contribution |
|---|---|
| Architect | Space, layout, function, design concept, detailing |
| Interior designer | Interior experience, materials, furniture, styling depending on the scope |
| Specialist engineers | Structural, MEP, energy, and other technical matters |
| Contractor / builder | Organization and execution of the works |
| Tradespeople | Execution of specific works |
| Project / construction management | Coordination of time, crews, procurement, and construction |
In a comprehensive renovation, the question is not to choose “which one of them is needed.”
The goal is to properly coordinate the necessary disciplines.
Why should architecture and construction be discussed from the beginning?
A design can look excellent on screen and be difficult, expensive, or unreasonable to build.
Likewise, a purely contractor-led approach may solve technical issues quickly but lead to a series of fragmented decisions without an overall architectural concept.
The best process is created when:
design → engineering → costing → construction
do not operate as isolated phases.
Example: a concealed door
On a drawing, it looks like a simple line.
In reality, the following must be resolved:
- wall thickness,
- frame,
- hinges,
- skirting,
- paint or cladding,
- switches,
- possible electrical lines,
- construction tolerances.
The same applies to:
- concealed lighting,
- custom wardrobes,
- kitchen islands,
- concealed mixers,
- linear air-conditioning grilles,
- special cladding systems.
The quality of a renovation project is often determined by details that are not easily visible in photographs.
What about permits in a renovation?
Not all renovations require the same administrative process.
The type of permit or approval depends on the specific works, the property, and any special status the building may have.
In Greece, administrative procedures for building works are managed electronically through the e-Άδειες (e-Permits) system, while for works falling under an Approval of Small-Scale Building Works, the application is submitted electronically under the responsibility of the competent engineer.
For the owner, therefore, the safer question is not:
“Does the renovation require a permit?”
but:
“What exactly are we planning to build, and what procedure is required for this specific property?”
The answer should be given after the scope of works has been defined and the technical assessment completed.
When is an assessment needed before buying the property?
Ideally before the purchase is signed, when the property is intended for a major renovation.
An architectural pre-purchase assessment can help answer questions that are not visible in a property listing.
Before buying, it is worth knowing:
| Question | Why it is critical |
|---|---|
| Can the layout be changed? | It affects the entire concept |
| Where are the structural elements? | They may limit major changes |
| Is there enough natural light? | It cannot always be fixed through design |
| Is a second bathroom possible? | It depends on technical conditions |
| Can the kitchen be relocated? | It depends on systems and geometry |
| What condition are the windows and doors in? | They affect comfort and cost |
| Is there visible moisture? | Further investigation may be required |
| Are there planning issues? | They may affect the project |
| What is the actual extent of the renovation? | It affects the total investment |
A property with a lower purchase price is not necessarily more economical overall.
A more appropriate metric is:
purchase cost + actual transformation cost + quality of the final result.
When does an old apartment have good architectural potential?
A property should not be rejected simply because it looks old.
Sometimes the most interesting renovation projects begin with spaces that appear completely outdated on the first visit.
Features that can be an advantage
- large openings,
- good orientation,
- cross-ventilation,
- good room proportions,
- greater clear ceiling heights,
- interesting existing floors,
- potential to combine spaces,
- large balconies,
- open views,
- a structural system that allows functional reorganization.
Features that require attention
- minimal natural light,
- a very deep floor plan,
- problematic ventilation,
- severe moisture,
- high noise pollution,
- difficult access,
- complex old building systems,
- serious construction deterioration,
- restrictions that do not allow the desired concept.
The “ugly” can often be corrected.
A fundamentally poor spatial condition is much harder to fix.
How do you design a home for the real person who will live in it?
A renovation should begin with the user.
Not with the image.
For a family
The following may be important:
- clear separation of private spaces,
- extensive storage,
- laundry space,
- durable materials,
- an everyday dining area,
- a functional kitchen,
- the ability to adapt uses as the children grow.
For a couple
The following may matter more:
- a larger living area,
- a master suite,
- a home office,
- a guest space that can also serve another function,
- a more open everyday organization.
For someone who works from home
A home office does not necessarily mean a desk pushed against the living-room wall.
It requires:
- appropriate lighting,
- acoustics,
- a background for video calls,
- storage,
- the ability to concentrate.
For an investor
Decisions should be based more strongly on the likely end user.
Different products include:
- student residence,
- compact urban apartment,
- premium long-term residence,
- family apartment,
- furnished rental.
Design must know who it is designing for.
How is a renovation budget defined?
A renovation budget should not start and end with a general price per square meter.
Apartments of the same size can require completely different budgets depending on:
- the condition of the property,
- the state of the building systems,
- how much the layout changes,
- custom constructions,
- materials,
- windows and doors,
- the level of lighting design,
- equipment,
- access to the construction site.
The budget should be broken down
| Category | Examples |
|---|---|
| Demolition | Walls, floors, old constructions |
| Building works | New partitions, plastering, floors |
| Plumbing | Kitchen, bathrooms, pipework |
| Electrical | New circuits, electrical panel, automation |
| HVAC | Heating, cooling, ventilation |
| Windows and doors | Windows, balcony doors |
| Joinery | Kitchen, wardrobes, custom furniture |
| Lighting | Fixtures, architectural lighting |
| Materials | Stone, wood, tiles, surfaces |
| Equipment | Sanitaryware, appliances |
| Special constructions | Metalwork, glass, custom details |
This allows conscious choices to be made.
Instead of exhausting a large part of the budget on finishes and later discovering that insufficient funds were allocated to the building systems.
Where is it worth investing more?
Not every surface needs to be expensive.
There are, however, elements that have a major impact on everyday quality.
Often high-value investments
- the right layout,
- good lighting,
- quality windows and doors where required,
- properly designed electrical systems,
- properly designed plumbing,
- sufficient storage,
- a good kitchen,
- quality everyday-use surfaces,
- good acoustics,
- details that are used constantly.
Where can value engineering be applied?
- certain decorative finishes,
- selected loose furniture,
- non-critical special constructions,
- elements that can be added later.
Value engineering does not mean cheaper design.
It means:
where every euro creates real value.
What is the correct sequence for a comprehensive renovation?
| Stage | What happens |
|---|---|
| 1. Brief | Needs, lifestyle, budget, objective |
| 2. Survey | Recording the existing condition |
| 3. Technical assessment | Investigation of construction and building systems |
| 4. Concept design | Core architectural direction |
| 5. Layout development | Finalization of the floor plan |
| 6. Material strategy | Palette of materials and finishes |
| 7. Lighting design | Natural and artificial lighting |
| 8. Technical coordination | Electrical, plumbing, HVAC, etc. |
| 9. Construction details | Resolution of custom and critical details |
| 10. Costing | Cost review before construction |
| 11. Construction | Execution |
| 12. Supervision / coordination | Ensuring that what was designed is what gets built |
The more decisions that have been resolved before construction begins, the fewer need to be made under pressure during the works.
Which mistakes increase the cost of a renovation?
The greatest cost does not always come from expensive materials.
It can come from changes.
Common costly mistakes
- Starting construction before the layout has been finalized.
- Choosing the kitchen before the electrical and plumbing design has been resolved.
- Changing the lighting after the ceilings have been closed.
- Ordering materials without final quantities.
- Custom constructions without detailed drawings.
- Changing the positions of outlets and switches during construction.
- Choosing materials that are not immediately available without allowing for lead times.
- Starting without a clear overall budget.
- Lack of coordination between crews.
- Solving problems only when they appear on site.
Design does not eliminate every unforeseen issue.
But it significantly reduces the number of decisions that should have been made earlier.
Architect before or after choosing a contractor?
Ideally, the architectural direction and scope should be sufficiently clear before final construction quotations are compared.
Otherwise, there is a risk of comparing different things.
One contractor may have included:
- new electrical systems,
- new plumbing,
- a custom kitchen,
- complete lighting.
And another may have included only:
- building works,
- basic flooring,
- painting.
The two figures are not truly comparable.
Design documentation helps make it clearer:
what exactly we are building.
When do you not need a full architectural renovation?
Not every project requires a comprehensive redesign.
If:
- the layout already works well,
- the building systems are in good condition,
- no core functions are changing,
- the budget mainly concerns finishes and loose equipment,
- there are no complex technical issues,
a more limited scope may make sense.
Good professional advice is not about artificially expanding the project.
It is about determining how much intervention is actually needed.
What does an architectural firm offer in a renovation?
The value does not simply lie in producing beautiful images.
A comprehensive architectural firm in Thessaloniki can connect:
space + function + aesthetics + technical requirements + construction.
In practical terms, this means:
- assessment of the existing property,
- organization of the brief,
- a new layout,
- material selection,
- lighting strategy,
- kitchen and custom furniture design,
- coordination of technical matters,
- construction drawings,
- cost control in relation to the design,
- coordination of implementation depending on the project scope.
THE ARDE STUDIO® has included apartment renovation and spatial transformation projects in its residential portfolio, with the Sofouli Residence in Thessaloniki serving as a representative example of a residential renovation in which contemporary interior architecture, natural materials, lighting, and custom constructions are treated as a unified composition.
Frequently asked questions about home renovation in Thessaloniki
When do I need an architect for an apartment renovation?
When a renovation substantially changes the layout, functions, lighting, building systems, or spatial quality, an architect’s involvement can significantly affect the result.
For a simple aesthetic refresh, the scope may be smaller.
Is it worth hiring an architect before buying an old apartment?
For a property intended for a major renovation, yes, it can be particularly useful.
An architectural and technical assessment can reveal whether the layout can change, whether there is enough light, what technical difficulties exist, and how realistic the project you have in mind actually is.
Does a home renovation require a permit?
It depends on the type and extent of the works, as well as on the property itself.
Not all renovations are treated in the same way. Before work begins, the competent engineer should determine which approvals or permits are required for the specific scope.
How much does an apartment renovation in Thessaloniki cost?
There is no single reliable price that applies to every project.
The cost depends on:
- size,
- condition,
- extent of demolition,
- building systems,
- windows and doors,
- level of materials,
- custom constructions,
- technical difficulties,
- access,
- project requirements.
For a serious estimate, what will actually be built must first be defined.
How long does a comprehensive renovation take?
The timeline depends on the size and complexity of the project, the level of design development, required approvals, procurement of materials and custom constructions, and site conditions.
Proper planning should begin before the works start.
Can I stay in the home during the renovation?
Possibly, for very limited works.
For a complete renovation involving demolition, building systems, floors, dust, and multiple crews, living in the home at the same time is usually extremely difficult and should be evaluated from the outset.
Is it better to renovate or buy an already renovated apartment?
It depends on the objective.
An already renovated property offers convenience.
A well-designed renovation project, however, allows the home to be designed around:
- your own needs,
- your own lifestyle,
- the specific property,
- and the long-term use you want.
A good renovation does not begin with what will change
It begins with what is worth keeping.
Before a wall is demolished, we should know why.
Before a kitchen is moved, we should know what we gain.
Before a material is selected, we should know what role it plays in the overall space.
And before construction begins, there should be as clear a picture as possible of the result we are trying to achieve.
For THE ARDE STUDIO®, home renovation in Thessaloniki is not treated as a series of isolated tasks.
It is treated as the reassessment of an existing space:
what has value, what does not work, what can change, and how the existing property can develop a new, more meaningful relationship with the person who will live in it.
Are you planning a home renovation in Thessaloniki?
Whether it is an old apartment you already own or a property you are considering buying, the right architectural assessment can take place before the most expensive and difficult-to-reverse decisions are made.
Discuss your residential renovation with THE ARDE STUDIO®.